TIP No. 14: RESILIENCE FOR SERVICEABILITY & FUTURE PROOFING
For a long-term Client relationship of Trust, we always defer to the Client’s choice of H.P. equipment with their Vendor’s supply of Brand & Model as well as their chosen Contractor. Our counselling is limited to a “most preferred” site location for the H.P. installation with a one+ meter all surround Service Space. Also, we provide guidance on internal H.P. componentry as “modular” lift-in/lift-out for full on-site low-cost Servicing instead of any return to Factory necessity (even in the case of a Design for a multi-cascade of mini H.P.). This “Resilience by Design” also allows for long-term, low-cost on-site, product “Future-Proofing” upgrades with all main components (Evap Coil; Fan; Compressor; Condenser & Controls as an easy un-plug & modular re-connect in a wide bodied H.P. Cabinet enclosure).
Join our discussion by making a comment below which will be moderated and published ASAP.



Leave a Reply
Want to join the discussion?Feel free to contribute!